通过对大跨度干硬性混凝土预应力空心板生产技术的研究,分析各个生产环节的控制重点,形成了大跨度干硬性混凝土预应力空心板的生产流水,取得较好的效益,可为类似预应力构件的生产提供经验。
Through the research on the production technology of long-span prestressed dry-hard concrete hollow slab,the key control points of each production link are analyzed.The production flow of long-span prestressed dry-hard concrete hollow slab is developed and good benefits are achieved,which can provide references for the production of similar prestressed elements.
作者
邵志刚
周文赟
严相东
SHAO Zhigang;ZHOU Wenyun;YAN Xiangdong(Suzhou Lion Hill Construction &Installation Co.,Ltd.,Suzhou,Jiangsu 215152,China)
出处
《建筑施工》
2018年第12期2161-2162,共2页
Building Construction
关键词
干硬性混凝土
预应力
空心板
生产技术
dry-hard concrete
prestress
hollow slab
production technology