摘要 为提高地铁车站施工效率,保证工程质量,采取有效的施工技术是必要的。HPE液压工法是其中之一,它在工程建设中越来越受到重视与关注。本文介绍了HPE液压工法的施工原理和技术优势,结合石家庄2号线地铁站工程实例,就HPE液压工法在垂直插入型钢柱的应用进行探讨分析,并提出相应的施工技术措施,主要包括工艺流程和施工需要注意的问题,可为类似工程施工提供借鉴。 In order to improve the construction efficiency of subway station and guarantee the project quality, it is necessary to adopt effective construction techniques,among which HPE hydraulic method is one of them. This paper introduces the construction principle and technical advantages of HPE hydraulic engineering method.Combined with the example of Shijiazhuang Line 2 subway station project,the application of HPE hydraulic engineering method in vertical insertion type steel column is discussed and analyzed,and corresponding construction technical measures are proposed,including process flow and the problems that need attention in construction.This can provide inspiration for similar construction.
作者 高越 GAO Yue(China Railway 18^th Bureau Group the 4^th Engineering Co.,Ltd TianJin 300222China)
出处 《石家庄铁路职业技术学院学报》 2018年第4期24-28,共5页 Journal of Shijiazhuang Institute of Railway Technology
基金 河北省教育厅科技课题(Z2018238)
关键词 HPE 地铁车站 型钢柱 HPE The subway station Steel column
  • 相关文献

参考文献3

二级参考文献27

共引文献46

同被引文献11

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部