摘要
全过程机械化施工是国家电网工程建设的重点发展方向,旨在提高电力线路工程建设的安全质量和效率效益。对电力线路进行全过程机械化施工可行性分析及优化分析,评价工程各个因素对机械化施工的影响和限制条件,提出较为完整的电力线路机械化施工评价分析方法和原则,对关键施工机械的研发提出进一步规划和要求。同时,介绍了全过程机械化施工在某电网初步方案设计中的实际应用,为实际工程应用提供具体指导意见。
Whole process mechanized construction is the future development direction in electrical power network construction project of State Grid,promoting safety,quality and efficiency benefits.Feasibility and optimization of the whole process mechanized construction for transmission line are performed with the influence of various factors on mechanization construction and the limiting conditions evaluated.Based on the above assessment,the mechanized construction evaluation criterion is proposed,and the further planning and requirements are put forward for the key construction machinery.The application in the electrical network construction design of the electric transmission line is introduced.Specific guidance discussed is provided.
作者
邵冬亮
王龙
李志
何春晖
孙永鑫
SHAO Dongliang;WANG Long;LI Zhi;HE Chunhui;SUN Yongxin(Shandong Electric Power Engineering Consulting Institute Co.,Ltd.,Jinan 250021,China)
出处
《山东电力技术》
2018年第11期32-36,共5页
Shandong Electric Power
关键词
输电线路
全过程机械化施工
设计原则
工程应用
transmission line
whole process mechanized construction
design principle
engineering application