摘要 针对省内燃煤机组利用小时数逐年减低,甚至出现夏季长时间调停的现象,内陆闭式循环机组可通过打通两台机组循环水回水管路,将停运机组的冷却塔并入运行机组,实现"一机双塔"运行,降低运行机组背压,提高经济性。以某330 MW和660 MW闭式循环机组"一机双塔"改造为例,通过试验研究,结合冷却塔、凝汽器变工况计算模型,得出一机双塔改造效果。 In view of the phenomenon that utilization hours of coal-fired units decreased year by year,even long-time outage occurred in summer in Zhejiang Province,by connecting the return pipelines of the two closed cycle units,the cooling tower of the shutdown unit is merged into the operating unit to realize the 'one unit running with two cooling towers'operation,it could reduce the back pressure and improve the economics.Taking two cases of cooling tower reform of a 300MW unit and a 660MW unit for example,by actual testing and combining with the variable condition calculation of cooling tower and condenser,the transformation effect is obvious.
作者 华敏 王飞 赵佳骏 潘雷鸣 郭小健 HUA Min;WANG Fei;ZHAO Jia-jun
出处 《电站系统工程》 2019年第1期34-36,共3页 Power System Engineering
关键词 冷却塔 循环水 改造 一机双塔 变工况 试验研究 cooling tower circulating water transformation one unit with two cooling towers variable condition research
  • 相关文献

参考文献3

二级参考文献4

  • 1600MW火电机组系列培训教材(第2分册):汽轮机设备与运行[M].北京:中国电力出版社,2009.
  • 2谭欣星.600MW火电机组系列培训教材(第2分册):单元机组集控运行[M].北京:中国电力出版社,2009.
  • 3湖南省电力勘设计院.750C汽轮机设计资料(S].湖南省电力勘设计院.2005.
  • 4陈国年.发电厂冷端系统最优运行方式的研究[J].汽轮机技术,2004,46(1):69-70. 被引量:18