4Dietz M E. Low impact development practices:a review of current research and recommendations for future direc- tions[J]. Water Air Soil Pollut,2007,186( 1 ) :351 - 363.
5Alsharif K. Construction and stormwater pollution:poli- cy, violations, and penalties [ J ]. Land Use Policy,2010, 27(2) :612 -616.
6Rossman L A. Storm Water Management Model User' s Manual Version 5.0 [ M ]. Cincinnati : Water Supply andWater Resources Division, National Risk Management Research Laboratory ,2010.
7Smith C S,Lejano R P,Ogunseitan O A,et al. Cost ef- fectiveness of regulation-compliant filtration to control sediment and metal pollution in urban runoff[ J]. Envi- ron Sci Technol, 2007,41 ( 21 ) : 7451 - 7458.
8Hsieh P H,Kuo J T,Wu E M Y,et al. Optimal best management practice placement strategies for nonpoint source pollution management in the Fei-Tsui Reservoir Watershed[ J ]. Environ Eng Sci, 2010,27 ( 6 ) : 441 - 449.
9Veith T L, Wolfe M L, Heatwole C D. Optimization pro- cedure for cost effective BMP placement at a watershed scale[ J]. J Am Water Resour As,2003,39(6) : 1331 - 1343.
10USEPA. Green Infrastructure Opportunities and Barriers in the Greater Los Angeles Region [M]. EPA, EPA 833 R 13 001, 2013.