摘要
通过我国大科学装置建设项目郭守敬望远镜以及500米口径球面射电望远镜两个实例,分析预先研究阶段对于顺利完成工程建设的重要性。且通过对美国国家基金会以及欧洲科技基础设施战略论坛对于设施预先研究的管理及投资情况,剖析国外设施预先研究阶段管理要点。在此基础上提出要高度重视设施预先研究工作,建议建立适宜设施可持续发展的预先研究管理体制机制。
Through two examples of Chinese construction projects --the LAMOST telescope and the FAST telescope,this paper analyzes the importance of the advance research on the successful completion of the project. Based on the management and investment of NSF and ESFRI on the advance research of infrastructures,the key management points of foreign advance research of infrastructures are analyzed. On this basis,the paper emphasizes that advance research of infrastructures should be attached great importance to,and proposes the establishment of a mechanism of advanced research and management for the sustainable development of infrastructures.
作者
樊潇潇
李泽霞
宋伟
陈娟
Fan Xiaoxiao;Li Zexia;Song Wei;Chen Juan(University of Science and Technology of China,Hefei 230026,China;National Science Library,Chinese Academy of Sciences,Beijing 100190,China;Department of Library,Information and Archives Management,School of Economics and Management, University of Chinese Academy of Sciences,Beijing 100190,China;Institute of High Energy Physics,Chinese Academy of Sciences,Beijing 100049,China)
出处
《科技管理研究》
CSSCI
北大核心
2019年第2期31-36,共6页
Science and Technology Management Research
关键词
重大科技基础设施
预先研究
概念研究
工程技术验证
large scientific and technological infrastructure
advance research
concept research
engineering technical verification