简单直线和U型装配线平衡中的改进阶位法 被引量:9

Modified Ranked Positional Weight Technique for Assembly Line Balance of Simple Line and U-shape
下载PDF
导出
摘要 针对简单直线和U型装配线平衡问题,提出了改进阶位法.依据产品加工的作业元素时间和优先关系,综合考虑作业元素的时间阶位值和位置阶位值,求得综合阶位值.运用改进阶位法对装配线平衡问题求解,得到简单直线、单U型和双U型装配线的生产线平衡结果.结合算例1,对简单直线和U型装配线平衡效果与分枝定界法的结果进行了比较,改进阶位法的结果优于分枝定界法;结合实验算例2,验证了改进阶位法平衡效果好于时间阶位法,因此,改进阶位法是求解装配线平衡问题的有效方法. This paper presents a simple and U-shaped assembly line balance problem with the modified ranked positional weight technique.First,according to the processing time and priority relationship of each task,the synthetical ranked positional weight is obtained by taking the time-ranked weight and position-ranked weight into comprehensive consideration.Then the modified ranked positional weight technique is applied to the assembly line balance problem to obtain the balancing results of simple,single U-shaped and double U-shaped assembly lines.With the simple example 1,the comparison of the balance effects is performed in modified ranked positional weight technique and branch-and-bound method.With the experimental example 2,it is proved that the balance effect of modified ranked positional weight technique is better than that of the time-ranked weight technique.Therefore,the modified ranked positional weight technique is an effective method to solve assembly line balance problem.
作者 焦玉玲 邢小翠 朱春凤 徐良成 邹连慧 JIAO Yuling;XING Xiaocui;ZHU Chunfeng;XU Liangcheng;ZOU Lianhui(College of Transportation,Jilin University,Changchun 130021, China;College of Civil Engineering,Jilin Jianzhu University, Changchun 130021,China)
出处 《同济大学学报(自然科学版)》 EI CAS CSCD 北大核心 2019年第1期143-148,共6页 Journal of Tongji University:Natural Science
基金 国家自然科学基金(51775238)
关键词 工业工程 双U型装配线 改进阶位法 industrial engineering double U-shaped assembly line modified ranked positional weight technique
  • 相关文献

参考文献3

二级参考文献20

  • 1万旭,林健良,杨晓伟.改进的最大-最小蚂蚁算法在有时间窗车辆路径问题中的应用[J].计算机集成制造系统,2005,11(4):572-576. 被引量:43
  • 2SCHOLL A.Balancing and sequencing of assembly lines[M].2nd ed.Heidelberg,Germany:Physica-Verlag,1999:34-35.
  • 3SCHOLL A,BECKER C.State-of-the-art exact and heuristic solution procedures for simple assembly line balancing[J].European Journal of Operational Research,2006,168(3):666-693.
  • 4PONNAMBALAM S G,ARAVINDAN P,MOGILEESWAR NAIDU G.A comparative evaluation of assembly line balancing heuristics[J].International Journal of Advanced Manufacturing Technology,1999,15(8):577-586.
  • 5SABUNCUOGLU I,EREL E,TANYER M.Assembly line balancing using genetic algorithms[J].Journal of Intelligent Manufacturing,2000,11(3):295-310.
  • 6LAPIERRE S D,RUIZ A,SORIANO P.Balancing assembly lines with tabu search[J].European Journal of Operational Research,2006,168(3):826-837.
  • 7EREL E,SABUNCUOGLU I,AKSU B A.Balancing of Utype assembly systems using simulated annealing[J].International Journal of Production Research,2001,39 (13):3003-3015.
  • 8DORIGO M,GAMBARDELLA L M.Ant colony system:a cooperative learning approach to the traveling salesman problem[J].IEEE Transactions on Evolutionary Computation,1997,1(1):53-66.
  • 9GAMBARDELLA L M,TAILLARD E D,DORIGO M.Ant colonies for the quadratic assignment problem[J].Journal of the Operational Research Society,1999,50(2):167-176.
  • 10MERKLE D,MIDDENDORF M.Ant colony optimization with global pheromone evaluation for scheduling a single machine[J].Applied Intelligence,2003,18(1):105-111.

共引文献39

同被引文献66

引证文献9

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部