期刊文献+

大功率缺失下抽水蓄能机组分阶段有功控制方法与实现 被引量:5

Multi-stage Active Power Control Method and Implement of Pumped Storage Unit Under High-power Loss
下载PDF
导出
摘要 为了提高大功率缺失下抽水蓄能机组参与故障恢复的能力,提出了抽水蓄能机组分阶段有功控制方法。首先,基于抽水蓄能电站运行特点,构建了抽水蓄能机组参与有功控制的数学模型;其次,为满足大功率缺失下断面和频率的控制需求,提出了考虑机组安全运行约束的抽水蓄能机组分阶段有功控制方法;最后,结合在特高压受端省级电网的应用实践,验证了所述方法在大功率缺失下提升抽水蓄能机组响应能力的有效性。 In order to enhance the ability of the pumped storage unit to participate in the fault recovery under high-power loss, a multi-stage active power control method of pumped storage unit is proposed. Firstly, a mathematical model for pumped storage unit participating in active power control is developed based on the operational characteristics. Secondly, in order to meet the control requirements of the section and frequency under high-power loss, a multi-stage active power control method of pumped storage unit considering the safe operation constraints of the units is proposed. Finally, based on the practical operation strategies of the provincial ultra high voltage (UHV) receiving-end power grid, the effectiveness of the proposed method is verified.
作者 谈超 刘俊伟 张小白 李慧聪 李娜 滕贤亮 TAN Chao;LIU Junwei;ZHANG Xiaobai;LI Huicong;LI Na;TENG Xianliang(NARI Group Corporation (State Grid Electric Power Research Institute),Nanjing 211106,China;State Key Laboratory of Smart Grid Protection and Control,Nanjing 211106,China;State Grid Shandong Electric Power Company,Jinan 250001,China;Electric Power Research Institute of State Grid Shandong Electric Power Company,Jinan 250002,China)
出处 《电力系统自动化》 EI CSCD 北大核心 2019年第3期193-199,共7页 Automation of Electric Power Systems
基金 国家重点研发计划资助项目(2016YFB0900500) 国家电网公司科技项目"适应新能源发展的跨区全网一体化运行控制策略"~~
关键词 大功率缺失 自动发电控制 抽水蓄能机组 受端电网 high-power loss automatic generation control (AGC) pumped storage unit receiving-end power grid
  • 相关文献

参考文献11

二级参考文献148

共引文献449

同被引文献96

引证文献5

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部