摘要 在甲玛铜多金属矿地上地下并行大规模开采的复杂条件下,针对地下二期复杂厚大矿体的安全高效回采问题,综合分析矿山开采现状的基础上,提出2种盘区回采顺序方案,采用数值模拟方法对不同的盘区回采方案进行了分析优选,通过对比分析不同回采顺序条件下采场等关键部位的应力、位移的动态响应特性,确定盘区间隔回采方案最佳,该方案可为地下二期矿体安全高效开采提供技术支持。 Under the complicated conditions of large-scale mining in the ground and underground on the Jiama copper polymetallic ore site,based on the comprehensive and analytical mining status of the second-stage complex thick and large ore body,two types of panel mining sequence schemes were proposed.The numerical simulation method was used to analyze the optimization of different panel mining schemes.By comparing and analyzing the dynamic response characteristics of stress and displacement of key parts such as stope in different mining sequence conditions,interval mining scheme was determined to be better.This program can provide technical support for the safe and efficient mining of the underground second-stage ore body.
作者 关士良 陈国良 王志修 解联库 GUAN Shiliang;CHEN Guoliang;WANG Zhixiu;XIE Lianku(Tibet Huatailong Mining Development Co.,Ltd.,Lasa 850200,China;BGRIMM Technology Group,Beijing 100160,China;National Center for International Joint Research on Green Metal Mining,Beijing 102628,China)
出处 《有色金属(矿山部分)》 2019年第1期5-9,共5页 NONFERROUS METALS(Mining Section)
基金 国家自然科学基金资助项目(41602365) "十三五"国家重点研发计划项目(2016YFC0600709) 国家科技支撑计划课题(2012BAB01B01)
关键词 厚大矿体 回采顺序 数值模拟 动态模拟 thick and large ore body recovery sequence numerical simulation dynamic simulation