5.5 m捣固焦炉长结焦时间冬季生产中遇到的问题及解决措施 被引量:1

5.5 m Long Tamping Coke Oven Coking Time in Winter Production Problems Encountered and the Measures to Solve the Problems
下载PDF
导出
摘要 就酒钢焦化厂5#、6#捣固焦炉在结焦时间60 h,且在冬季极端最低温度近零下20℃的生产环境下,对捣固过程中煤饼大面积垮塌、装煤过程中集气管压力持续偏高等问题进行了分析,并针对严重影响焦炉生产的具体问题,结合酒钢焦化厂生产和技术改造实践提出了可行的解决措施,防止了事故的发生,稳定了生产秩序。 In this paper,utilizing the coking plant of 5#,6# tamping coke oven in the coking time into 60 hours,nearly 20 degrees below zero and extreme minimum temperature in winter in a production environment,process China coal cake largearea collapse of tamping,cimc is continuous higher problem of tracheal pressure coal process are analyzed,and according to the specific problem of the serious influence of coke oven production,utilizing the coking plant production and technical reformation practice feasible solving measures are put forward,to prevent the occurrence of the accident,the stable production order.
作者 杨召垒 YANG Zhao-lei(Jiuquan Iron and Steel Group Co.Ltd.,Jiayuguan 735100,China)
出处 《甘肃冶金》 2019年第1期114-115,共2页 Gansu Metallurgy
关键词 捣固焦炉 冬季 长结焦时间 tamping coke oven the winter long coking time
  • 相关文献

参考文献3

二级参考文献2

共引文献4

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部