期刊文献+

特厚煤层综放开采停采煤柱优化的研究 被引量:4

Study on Optimization of End-mining Coal Pillar in Top-coal Caving Mining of Extremely Thick Coal Seam
下载PDF
导出
摘要 综放工作面停采煤柱的宽度影响着煤炭资源回收及盘区大巷的稳定性,以塔山煤矿8110综放工作面为工程背景,通过超前支承压力极限平衡理论计算,FLAC^(3D)数值模拟分析,结合现场实测的分析,对综放工作面停采煤柱的宽度进行优化,在保证盘区大巷稳定的前提下,提高煤炭资源回收率。 The width of end-mining coal pillar affects coal recovery rate and the stability of pannel roadway in fully mechanized caving. A case in the Tashan coal mine 8110 fully mechanized caving face,through the theory of limit equilibrium of abutment pressure calculation, FLAC3Dnumerical simulation analysis, combined with the field measurement,optimize the width of end-mining coal pillar in top-coal caving mining face.Under the premise of ensuring stability of roadway panel, improved the recovery rate of coal resources.
作者 王志坚 WANG Zhi-jian(Tashan Coal Mine Co.,Ltd.,Datong Coal Mine Group,Datong 037001,China)
出处 《煤炭技术》 CAS 2019年第2期26-28,共3页 Coal Technology
关键词 特厚煤层 综放开采 停采煤柱 数值模拟 支承压力 extremely thick coal seam fully mechanized caving mining stop coal pillar numerical simulation support pressure
  • 相关文献

参考文献7

二级参考文献57

共引文献521

同被引文献41

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部