摘要
依托工程实例阐述桥梁承台采用无底钢套箱围堰施工过程,施工期间结合常见问题,通过调查分析查明原因,采取优化法兰盘结构设计、提高套箱刚度、提高套箱整体稳定性等措施,有效解决问题。
Based on engineering examples,the construction process of bottomless steel casing cofferdam for bridge cushion cap is expounded.During the construction,the causes of common problems shall be identified through investigation and analysis,and the problems were effectively solved by taking measures such as optimizing the flange structure design,improving the stiffness of casing and box,and improving the overall stability of casing and box.
作者
吴成宏
傅志霖
WU Cheng-hong;FU Zhi-lin(FuJian Branch of CCCC Shanghai Dredging Co. Ltd., Xiamen 361000, China;Xiamen Branch of CCCC Third Harbor Engineering Co. Ltd., Xiamen 361000,China)
出处
《工程建设与设计》
2019年第3期233-236,共4页
Construction & Design for Engineering
关键词
无底钢套箱
套箱拼装
混凝土灌注
bottomless steel casing
case assembly
concrete placement