南宁某超限项目收缩和徐变分析

Analysis on shrinkage and creep of an over-limited project in Nanning
原文传递
导出
摘要 本工程为钢筋混凝土核心筒+钢管混凝土框架混合结构,采用欧洲规范CEB-FIP模式计算混凝土收缩徐变影响,具体分析了竖向构件累积变形以及收缩徐变对框架柱的影响。分析结果表明,施工完成5年后最大柱轴力(与伸臂桁架连接处柱)约增加10%,在施工图设计阶段应考虑收缩徐变的不利影响,并采用调平设计。收缩徐变对伸臂桁架内力和变形产生影响,计算中应考虑此部分荷载叠加,使伸臂桁架满足规范要求。重力荷载引起的楼层水平位移会影响设备的安装,设计中也应考虑。同时施工阶段和使用阶段必须对收缩徐变进行监控。 The project is a reinforced concrete core tube + concrete-filled steel tube frame hybrid structure.The European standard CEB-FIP mode was used to calculate the shrinkage and creep of concrete.The cumulative deformation and shrinkage and creep of the vertical members were analyzed.The analysis results show that the maximum column axial force( with the column of the truss joint) increases by about 10% after 5 years of construction,and the adverse effects of the deformation should be considered in the design stage of the construction drawing,and the leveling design is adopted.Shrinkage and creep have an effect on the internal force and deformation of the outrigger truss.This part of superimposed load should be considered in the calculation,so that the outrigger truss meets the requirements of the specification.The horizontal displacement of the floor caused by gravity loads will affect the installation of the equipment and should also be considered in the design.The deformation must be monitored during both the construction phase and the use phase.
作者 李元章 Li Yuanzhang(RBS Architectural Engineering Design Associates,Guangzhou 510170,China)
出处 《建筑结构》 CSCD 北大核心 2019年第3期32-37,共6页 Building Structure
关键词 钢管混凝土 伸臂桁架 收缩徐变 重力荷载 concrete-filled steel tube outrigger truss shrinkage and creep gravity load
  • 相关文献

参考文献1

二级参考文献13

  • 1王湛.钢管膨胀混凝土的徐变[J].哈尔滨建筑工程学院学报,1994,27(3):14-17. 被引量:17
  • 2谭素杰 齐加连.长期荷载对钢管混凝土受压构件强度影响的实验研究[J].哈尔滨建筑工程学院学报,1987,(2):10-24.
  • 3Wang Y Y, Geng Y, Ranzi G, et al. Time-dependent behaviour of expansive concrete-filled steel tubular columns[J]. Journal of Constructional Steel Research, 2011, 67(3): 471-483.
  • 4Uy B. Static long-term effects in short concrete-filled steel box columns under sustained loading [J]. ACI Structural Journal, 2001, 98 (1) : 96-104.
  • 5Goel R, Kumar R, Paul D K. Comparative study of various creep and shrinkage prediction models for concrete[J]. Journal of Materials in Civil Engineering,2007, 19(3) : 249-260,.
  • 6Gilbert R I, Ranzi G. Time-Dependent Behaviour of Concrete Structures [M]. UK: Spon Press, 2011.
  • 7Terrey P J, Bradford M A, Gilbert R I. Creep and shrinkage of concrete in concrete-filled circular steel tubes [C]//Proc of 6th Inter Symposium on Tubular Structures. Melbourne, Australia, 1994: 293-298.
  • 8Ichinose L H, Watanabe E, Nakai H. An experimental study on creep of concrete filled steel pipes [J]. Journal of Constructional SteelResearch, 2001, 57(4): 453-466.
  • 9Kwon S H, Kim Y Y, Kim J K. Long-term behaviour under axial service loads of circular columns made from concrete filled steel tubes [J]. Magazine of Concrete Research, 2005, 57(2): 87-99.
  • 10Morino S, Kswanguchi J, Cao Z S. Creep behavior of concrete filled steel tubular members [C]//Proc of an En-gineering Foundation Confer on Steel-Concrete Compos- iteStructures. Irsee, Germany, 1996: 514-525.