期刊文献+

加热炉的最优预防维修周期 被引量:1

The optimum preventive maintenance period of reformer furnace
下载PDF
导出
摘要 随着高温工程学的发展 ,建立既精确又行之有效的高温构件的寿命预测方法和制订相应的维修策略已成为国民经济相关行业中众所关心和亟待开发的领域。以概率计算方法获得的高温炉管寿命与可靠性关系为基础 ,解决了高温构件炉管在定期预防维修方针下 ,按费用最低原则和有效度最高原则确定最优预防维修周期问题。最后在此基础上 ,确定了加热炉最优预防维修周期问题 。 Life time prediction technology of plant equipment has been one of the most attractive research topics in modern engineering science and has been regarded as the emerging technology of 21st century. As the development of high temperature science & engineering it becomes the urgent field to build up precise and effective life time prediction method of high temperature components and to schedule the relevant maintenance. Based on the relationship between the life time and reliability obtained by the probabilistic calculation of furnace tube, the preventive maintenance concept is applied to the maintenance of reformer furnace. The problem of optimum maintenance period are determined by use of least cost and highest availability principle. It is suggested that the preventive maintenance strategies under age-based maintenance should be used to fulfill engineering requirements.
出处 《南京工业大学学报(自然科学版)》 CAS 2002年第2期39-42,共4页 Journal of Nanjing Tech University(Natural Science Edition)
关键词 高温炉管 加热炉 预防维修 最低费用原则 有效度最高原则 最优预防维修周期 化工设备 furnace tube reformer furnace preventive maintenance least cost principle highest availability principle
  • 相关文献

参考文献4

  • 1周昌玉.高温构件概率寿命预测、可靠性评估及预防维修规划技术[M].南京:南京化工大学,2000..
  • 2贾尔丁A K S.维修、更换和可靠性[M].北京:机械工业出版社,1985..
  • 3中国石化总公司.一段转化炉维护检修规程,石油化工设备维护检修规程--化肥设备[M].北京:中国石化出版社,1994..
  • 4王兰田(译) 李应阳.美国石油学会推荐实用规程,炼油厂加热炉炉管壁厚计算(第三版,1988)[M].北京:中国石油化工总公司设备技术中心站,1989..

共引文献1

同被引文献17

  • 1何庆.预防维修周期的数学模型[J].农业机械学报,2005,36(2):153-154. 被引量:11
  • 2吴波,谌先文,丁毓峰,江征风.机械系统的维修策略模型及应用[J].武汉理工大学学报,2005,27(2):38-41. 被引量:9
  • 3贾积身,刘思峰,党耀国.退化可修系统最优更换策略[J].系统工程理论方法应用,2006,15(1):80-82. 被引量:8
  • 4贾积身,刘思峰,党耀国.修理工单重休假可修系统优化管理研究[J].系统工程理论与实践,2007,27(7):98-104. 被引量:6
  • 5[3]Barlow.M.,Proschan.F.Imperfect repair[J].J.Appl.probab,1983,20:851-859.
  • 6[4]Nakagawa T..Optimal number of failures before replacement time[J].IEEE Trans.Reliability,1983,R32:115-116.
  • 7[8]Love,C.E.,Guo,R.Utilizing Weibull failure rates in repair limit analysis for equipment preventive maintenance decisions[J].Journal of the Operational Research Society,1996,47 (11):1366-1376.
  • 8[9]Pham,H.,Wang,H..Imperfect maintenance[J].European Journal of Operational Research,1996,94:425 -438.
  • 9[10]Timothy,S.,Vaughan.Failure replacement and preventiv maintenance spare parts ordering policy[J].European Journal of Operational Research,2005,161:183 -190.
  • 10[11]Brisa,R.,Chateletb,E.Yalaou,F.New method to minimize the preventive maintenance cost of series-parallel systems[J].Reliability Engineering & System Safety,2003,82:247-255.

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部