摘要
介绍用三角形网格法确定场地平整设计平面的原理和用线性规划计算调整设计平面后非平衡土方调配方案的方法 ,并用电子表格软件 Excel进行实例设计计算。该法基础数据输入量小 ,调整和试算速度快 ,结果准确 ,符合工程实际 ,可满足工程需要。
Principle of designing construction plane for ground leveling with triangle grid and method of calculating the deployment scheme of unbalanced earthwork with linear programming are introduced. A case calculated by Excel is given. The method costs less input of basic data with fast speed of regulation and trial calculation . The calculation result is accurate while the operation is simple and the method can be applied in projects.
出处
《武汉理工大学学报》
CAS
CSCD
2002年第4期84-86,共3页
Journal of Wuhan University of Technology
关键词
场地平整
施工方案
设计方法
三角形网格法
线性规划
ground leveling
construction scheme design
triangle grid method
linear programming