摘要
针对武钢二炼钢厂老式连铸机大包旋转塔研制了移动式大包加盖装置 ,成功地解决了旋转塔超负载和空间狭小问题。实现了大包加盖工艺 ,取得了良好的效果。
A movable ladle cover is developed for the ladle turret of the old type continuous caster in the No.2 steel Plant WISCO and therefore the problems concerning overload and narrow space for the turret are successfully solved. Better results have been achieved since the ladle covering process is implemented in the Plant.
出处
《炼钢》
CAS
北大核心
2002年第2期11-13,共3页
Steelmaking