摘要
介绍了由日本国际事业协力团(JICA)广泛采用的对外科技合作开发项目管理的一种新方法———项目全程管理(PCM)方法,并对其主要原理与实施要点进行了较详细的讨论。
This paper introduced concisely a n ew method of Project Cycling Managem ent (PCM)for overseas technology cooperative developmen t,which has been used by Japan intern ational cooperative agency(JICA).The principle and key points are also dis cussed in the paper.
出处
《科技进步与对策》
北大核心
2002年第4期107-109,共3页
Science & Technology Progress and Policy