摘要
高坝洲水电站土石围堰布置四种防渗型式 ,分别是柔性混凝土防渗墙、现浇混凝土防渗墙、粘土心墙和土工布。通过对不同类型防渗墙的施工方法的介绍、比较 。
The equal emphasis of project construction and environment protection is a characteristic of the construction of GHS. From the beginning of the construction of the Station, the construction units have put forward the construction objectives of 'short construction period, high quality, low investment and beautiful environment'. In the planning and implementation of environment protection in the construction area of GHS, the economic benefit, social benefit and ecological benefit are organically integrated. The relationship of project construction and environment protection is correctly understood. The scientific planning and management responsibility system are carried out so that the good circulation of project construction, ecological environment and economic development is realized.