关于青藏高原冻土钻孔打入桩施工初探

The simple discuss on the construction of drilled and driven pile of the frozen soil in Qingzang plateau
下载PDF
导出
摘要 通过对青藏铁路清水河试验段桩基施工 ,分析了覆盖土的岩性及冻土特征 ,提出了几种适宜于冻土的桩基类型。通过钻孔取样 ,并参考设计规范中有关条文 ,确定了采用钻孔打入桩效果最佳。介绍了钻孔打入桩的施工情况 。 Through the pile foundation construction in Qingshui river test section of Qingzang railway the rock character and the characteristic of frozen soil of overburden soil are analyzed and some pile foundations adapting to frozen soil are proposed. Based on the drilled sampling and reference in design norms the conclusion of adopting drilled and driven pile is the best choice is acquired. The construction situations of this kind of pile are introduced and the summary of the drilled and driven pile for the past several years are made.
作者 李彦平
机构地区 中铁十二局四处
出处 《山西建筑》 2002年第2期27-28,共2页 Shanxi Architecture
关键词 冻土 钻孔打入桩 桩基施工 青藏高原 frozen soil of plateau, characteristic of frozen soil, drilled and driven pile, pile foundation construction
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部