公共交货期窗口下提前/拖期多机调度的开工时间问题 被引量:2

Notes on start times of earliness-tardiness job scheduling problem with common due window on parallel machines
下载PDF
导出
摘要 随着JIT(Just In Time)生产管理技术的出现和发展 ,考虑零件提前 /拖期费用的生产排序与调度问题已成为人们研究的热点领域 .近几年有许多学者都研究了公共交货期窗口下提前 /拖期多机零件排序问题 ,但所有机器都是零时刻同时开始加工零件的。本文通过例子分析说明 ,公共交货期窗口下提前 /拖期都有惩罚的多机排序问题 ,如果所有机器都在零时刻同时开始加工零件并不一定能获得最小惩罚值。实际上 ,通过让某些机器在指定时刻后才开始加工 ,反而能获得更小的惩罚值。最后 ,本文提出一个确定指定机器的加工开始时刻的方法 ,具有很高的实际价值。 The emergence of JIT (Just In Time) management technology open up a recent research field for the job scheduling and production management. As it further develops, the earliness-tardiness job scheduling problem has become a hot research area over years. The earliness-tardiness job scheduling problem with a common due window on parallel machines was researched by many scholars this year. But they all assumed that the start times are zero for all machines. This artical will show that the zero start times for all machines does not ensure the scheduling results to be optimal. The author gave examples to illustrate that the no-zero start times for some machines can get better solutions and present a useful method to get the start time of each machine.
作者 黄德才
出处 《浙江工业大学学报》 CAS 2002年第2期153-155,63,共4页 Journal of Zhejiang University of Technology
基金 浙江省自然科学基金资助项目 ( 6 0 10 76 )
关键词 公共交货期窗口 多机调度 开工时间 生产管理技术 生产排序 提前/拖期 JIT 零件排序 earliness-tardiness JIT due window job scheduling
  • 相关文献

参考文献3

二级参考文献2

共引文献14

同被引文献16

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部