摘要
通过某高速公路A桥4#墩桩基的综合分析与验算,对软土地基桥台和近台桥墩的桩基设计与施工提出了初步改进措施.
Through comprehensive analysis and check computations of the pile of No.4 pier of a certain highway, this essay presents a tentative improving measures to the pile of soft soil foundation abutment and bridge pier in designing and construction.
出处
《湖南城建高等专科学校学报》
2002年第1期28-30,共3页
Journal of Hunan Urban Construction College
关键词
软土地基
桥墩
桩基
设计
施工
soft soil foundation
pile foundation of abutment
pile foundation of bridge pier
designing
construction
analysis and check computations