摘要
介绍贵州某自备电厂工程设计滑坡治理的工程实例中 ,滑坡推力的计算。
This paper introduces the calculation for pushing force of landslide, the program alternative of bracing structure and the design of bracing structure, as the project of Guizhou self-contained electric power plant for the example.
出处
《化工设计》
CAS
2002年第2期43-44,25,共3页
Chemical Engineering Design