通过对含硫污水装置现状分析及全面核算 ,选用新型塔盘 ,更换原有设备 ,增加新设备 ,对汽提装置进行扩能改造 。
Based on analyzing the current condition of the existing sewage stripping unit and carrying out an overall cost accounting, the existing unit is expanded and modified, the new type column tray is selected, the existing equipment replaced and the new equipment added thus the capacity can meet the total flow requirement of the plant.
出处
《化工设计》
CAS
2002年第1期49-50,共2页
Chemical Engineering Design
关键词
含硫污水汽提装置
技术改造
扩能
杂质
塔盘
sewage stripping unit technical modification capacity expansion