经营过程重构的时间、质量和成本折衷模型 被引量:2

Trade-off Model among Time, Quality and Cost for Business Process Reengineering
下载PDF
导出
摘要 企业要成功地实施经营过程重构需要有定量的方法论作指导 ,才能对重构的效果有一个清醒的认识 ,但目前还没有一个完善的时间、质量和成本折衷考虑模型作为重构及优化的依据。本文基于阶梯形CIM体系结构所给出的企业模型框架 ,进一步阐述了经营过程重构的概念。通过引入相应于不同质量等级的单位时间成本的概念 ,建立了时间、质量和成本折衷考虑的多目标线性规划模型。根据本文所提出的模型进行重构及优化 ,有助于避免经营过程重构的盲目性和无目的性 ,支持经营过程的持续改进 ,从而可有效地减少经营过程重构的投资风险。 The successful implementation of business process reengineering (BPR) for an enterprise should be guided by the quantitative methodology, so that the reengineering results can be clearly predicted and acknowledged, however, at present there is no perfect model yet to deal with the trade*Moff between time, quality and cost as a basis of reengineering and optimization. In this paper, based on the stair-like CIM architecture (SLA) giving the model framework of an enterprise, the concept of BPR is further elucidated, and the multi*Mcriteria linear programming models are established to tackle the trade*Moff between time, cost and quality by introducing the concept of unit time cost corresponding to different quality levels (UTCQ). Reengineering and optimization according to the models presented in this paper can avoid the blindness and aimlessness for BPR, support the continuous improvements of business process, and thus effectively reduce the investment venture for BPR.
出处 《计算机集成制造系统-CIMS》 EI CSCD 北大核心 2002年第4期269-273,共5页
基金 国家自然科学基金资助项目 ( 6 97840 0 5 ) 国家 86 3/CIMS主题资助项目 ( 86 3-5 11-930 -0 14 )~~
关键词 经营过程重构 时间 质量 成本拆衷模型 企业 critical path method with constraints multi*Mcriteria linear programming process view business process modeling business process reengineering
  • 相关文献

参考文献3

二级参考文献4

  • 1Chadwick LeslicL 夏俊(译).管理会计[M].北京:中信出版社,1997..
  • 2夏俊(译),管理会计,1997年
  • 3陈禹六,IDEF建模分析和设计方法,1999年
  • 4陈禹六,赵虹.CIM系统体系结构中的经济视图[J].计算机集成制造系统-CIMS,1999,5(1):39-46. 被引量:4

共引文献23

同被引文献24

  • 1林健,张国刚.运用作业管理思想重构企业流程的实证研究[J].铁道科学与工程学报,2001(4):41-46. 被引量:5
  • 2SHOUMAN M A,El-NOUR A,EBRAHIM S,et al.Mixed integer linear programming model for a time cost trade-off[J].Advances in Modelling & Simulation,1991,22(4):53-63.
  • 3ERENGUC S,SELCUK T.Time/cost trade-off problems with discounted cash flows using generalized benders decomposition[J].Naval Research Logistics,1993,40(1):25-50.
  • 4FENG Chungwei,LIU Liang,BURNS S A.Stochastic construction time-cost trade-off analysis[J].Journal of Computing in Civil Engineering,2000,14(2):117-126.
  • 5ICMELI O,ERENGUC S S.Resource constrained time/cost tradeoff project scheduling problem with discounted cash flows[J].Journal of Operations Management,1996,14(3):255-275.
  • 6HECHT M,HANDAL J.A discrete-event simulator for predicting outage time and costs as a function of maintenance resources[A].Proceedings of the Annual Reliability and Maintainability Symposium[C].2002,612-617.
  • 7BABU A J G,SURESH N.Project management with time,cost and quality considerations[J].European Journal of Operational Research,1996,88(2):320-327.
  • 8KHANG D B,MYINT Y M.Time,cost and quality trade-off in project management:A case study[J].International Journal of Project Management,1999,17(4):249-256.
  • 9邓聚龙.灰色系统基本方法[M].武汉:华中理工大学出版社,1988..
  • 10Hammer M, Champy J., Reengineering the Corporation : a manifesto for Business Revolution, Nicholas Brealey Publishing. 1993,32.

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部