基于双基标准的大型离散制造成本计划模式 被引量:1

Cost Plan Pattern Based on Bi-Standard for Large-Scale Intermittent Manufacturing
下载PDF
导出
摘要 大型离散制造具有订单设计的制造驱动方式、客户的项目管理要求、单件小批多品种大成套的生产组织方式等特征。在探讨大型离散制造特征与传统成本计划方法的本质冲突的基础上 ,提出了基于零基预算标准和工序费用标准的成本计划模式 ,进而给出了双基标准、双向编制、差异分析。 Large-scale intermittent manufacturing has the production characteristics of designed-to-order products, project scheduling for client, one-of-a-kind or low volume etc.. In light of analysis on the essential conflict between the above-mentioned characteristics and the traditional cost plan methods, this paper provided a cost plan pattern on base of zero-base budget standard and working operation cost standard. For more, it brought forward working procedure of bi-standard, bi-direction working out, variance analyzing and implementation with regulation. Its system realization was discussed.
出处 《计算机集成制造系统-CIMS》 EI CSCD 北大核心 2002年第4期306-310,共5页
基金 国家 8 6 3/CIMS主题资助项目 ( 2 0 0 1AA414 0 10 ) 国家科技攻关计划资助项目 ( 2 0 0 1BA2 0 1A0 3-KHKZ0 0 0 2 )~~
关键词 双基标准 大型离散制造 成本计划模式 零基预算标准 工序费用标准 CIMS large-scale intermittent manufacturing cost plan pattern zero-base cost standard working operation cost standard
  • 相关文献

参考文献3

  • 1李从东,齐二石,刘子先,刘爱军.基于过程和成本动因理论的成本控制问题研究[J].系统工程理论与实践,1999,19(3):88-93. 被引量:28
  • 2欧阳清.关于成本核算与考核改革方向的探讨--兼论目标成本会计在我国的应用.成本管理理论与旅游城市方法论[M].大连:东北财经大学出版社,1998.105-119.
  • 3康均.会计学派.走向21世纪的现代会计[M].大连:东北财经大学出版社,1997.172-182.

二级参考文献9

  • 1李钢.CIMS企业管理模式重构:研究生学位论文[M].天津大学,1996..
  • 2李建中.企业过程再造(BPR)的理论、方法与应用研究:研究生学位论文[M].天津大学,1997..
  • 3李从东 刘子先 等.FC效率评价模型及其在管理决策中的应用.首届国际工业工程与制造勤务员学术研讨会论文集[M].西安,1995..
  • 4齐二石 李从东 等.LHCF-CIMS工程(第二阶段)企业管理模式重构研究报告(巳通过国家科委863/CIMS主题专家组验收)内部资料[M].,..
  • 5李建中,博士学位论文,1997年
  • 6李钢,硕士学位论文,1996年
  • 7李从东,首届国际工业工程与制造工程学术研讨会论文集,1995年
  • 8齐二石,LHCFCIM S工程(第二阶段)企业管理模式重构研究报告
  • 9刘子先,李从东,李长贵.运用DEA方法优化轮胎生产成本的研究[J].轮胎工业,1997,17(11):686-689. 被引量:1

共引文献27

同被引文献8

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部