摘要
通过近几年实测资料的分析 ,得到了较为稳定的糙率值 经推流验证精度较高 。
Through anglyzing the observed data of recent years ,we obtain the stable relative roughness of this hydrologic station.The computed discharge verification shows that the accuracy is better.It provided the important reference for the feasibility of the slope area method in high water level in the Shizhenjie hydrologic station.
出处
《江西水利科技》
2002年第1期44-48,共5页
Jiangxi Hydraulic Science & Technology
关键词
比降面积法
糙率
可行性
Slope area method
Relative roughness
Application