摘要
本文对阳泉市娘子关供水二期工程一级泵站方案比选进行了介绍 ,确定了优化方案。
In this paper, two alternative layouts are firstly given for the first pumping station of Niangziguang second-stage water-supply project according to the practical situation of the first stage water-supply project and the requirement of the second-stage project, then the two alternative layouts are compared from the technological parameters, construction, operation, management and cost, finally the layout of alternative 'horizontal units and circular sunk well pump house with an internal diameter of 22m has been adopted.
出处
《山西水利科技》
2002年第1期36-39,共4页
Shanxi Hydrotechnics