摘要
以三峡工程永久船闸桥机轨道梁吊装工艺为例 ,对大型水利工程的吊装施工方案和具体实施方法进行了研究 .
In this paper, the hoisting program for the track beams of bridge crane over the permanent ship lock in the Changjiang Gorges hydraulic engineering is studied in detail, and based on it, the hoisting construction is conducted successfully.
出处
《广州大学学报(自然科学版)》
CAS
2002年第2期79-81,共3页
Journal of Guangzhou University:Natural Science Edition