摘要
某滑坡前缘大型抗滑挡墙开裂变形诱因复杂。文章基于监测、施工、检测资料,综合分析认为某挡墙开裂系上部堆料产生的局部土体挤压剪切变形所致。堆载、施工弱面、墙后填料差、排水不畅等因素为直接诱因。采取了"锚固+排水+控制堆载+监测"的综合处理措施,效果良好。
The incentives of the cracking deformation are complex for the large anti-sliding wall at the front of a certain landslide. Based on the data of the monitoring, construction and testing, the paper considers the cracking of a certain anti-sliding wall is induced by the partial soil extrusion shear deformation generated by the upper stacker through the comprehensive analysis. The direct incentives are the factors of the heaping load, the weak surface construction, the bad filler after the wall and the poor drainage. The comprehensive treatment measures of the anchoring, drainage, heaping load control and monitoring are adopted to achieve the better result.
出处
《东北水利水电》
2014年第7期56-58,72,共3页
Water Resources & Hydropower of Northeast China
关键词
大型抗滑挡墙
开裂
原因分析
处置
large anti-sliding wall
cracking
cause analysis
treatment