摘要
通过对托什干河沙里桂兰克至秋格尔渠首河段水电开发方案的研究与综合比较,从梯级工程地质条件、水能指标、工程布置及施工条件等方面选择了推荐方案:分别是别迭里一级、别迭里二级及牙满苏引水式开发。
Through study and comprehensive comparison on the alternatives for the hydropower development at section of Shaliguilanke to Qiugeer canal head of the Tuoshigan River, the recommended alternatives are selected in terms of the engineering geological conditions, hydroenergy indicators, project layout and construction conditions of the cascade projects. Namely, the alternatives for the hydropower de- velopment are respectively Dieli Hydropower Project I, Dieli Hydropower Project II and water-diverted Yamansu Hydropower Project.
出处
《西北水电》
2014年第3期9-12,共4页
Northwest Hydropower
关键词
水电开发
方案选择
开发顺序
托什干河
hydropower development
alternative selection
development sequence
Tuoshigan River