期刊文献+

新疆托什干河沙里桂兰克至秋格尔渠首河段水电开发方案选择

Alternatives for Hydropower Development at Section of Shaliguilanke to Qiugeer Canal Head of Tuoshigan River
下载PDF
导出
摘要 通过对托什干河沙里桂兰克至秋格尔渠首河段水电开发方案的研究与综合比较,从梯级工程地质条件、水能指标、工程布置及施工条件等方面选择了推荐方案:分别是别迭里一级、别迭里二级及牙满苏引水式开发。 Through study and comprehensive comparison on the alternatives for the hydropower development at section of Shaliguilanke to Qiugeer canal head of the Tuoshigan River, the recommended alternatives are selected in terms of the engineering geological conditions, hydroenergy indicators, project layout and construction conditions of the cascade projects. Namely, the alternatives for the hydropower de- velopment are respectively Dieli Hydropower Project I, Dieli Hydropower Project II and water-diverted Yamansu Hydropower Project.
作者 兰晶晶
出处 《西北水电》 2014年第3期9-12,共4页 Northwest Hydropower
关键词 水电开发 方案选择 开发顺序 托什干河 hydropower development alternative selection development sequence Tuoshigan River
  • 相关文献

参考文献3

  • 1DL/T5042-2010,河流水电规划编制规范[S].北京:中国电力出版社,2010.
  • 2DL/T5015-1996,水利水电工程动能设计规范[S].北京:中国电力出版社,1996.
  • 3黄强,王义民.水能利用[M].北京:中国水利水电出版社,2009.

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部