期刊文献+

金川水电站地下厂房开挖方案优化分析 被引量:1

Optimization and Analysis on Alternatives for Underground Powerhouse Excavation,Jinchuan Hydropower Project
下载PDF
导出
摘要 采用三维有限元方法对金川水电站地下厂房3种开挖方案进行数值模拟,对分期开挖过程中围岩破坏区、洞周位移、洞周应力的分布规律进行分析,结果表明:3种开挖方案在无支护情况下对围岩的影响基本相同,但开挖方案1略优于其他方案,建议在实际厂房开挖施工中采用方案1。 By application of 3D finite element method, the numerical simulations on three alternatives for the underground powerhouse excavation of Jinchuan Hydropower Project are performed. The distribution law of the failure zones of surrounding rock, displacement of the tunnel circumference and stress of the tunnel circumference during the excavation by stage is analyzed. The analyzing results show that impact by the three alternatives for the powerhouse excavation in condition of support absence is the same. But Alternative I is slightly better than the other two. Therefore, Alternative I is recommended to apply in the powerhouse excavation.
作者 黄秋枫 杨勇
出处 《西北水电》 2014年第3期19-23,共5页 Northwest Hydropower
关键词 地下厂房 数值模拟 开挖方案 优化分析 金川水电站 underground powerhouse numerical simulation excavation alternative optimization and analysis Jinchuan Hydropower Project
  • 相关文献

参考文献4

二级参考文献12

  • 1朱维申,Proceedings of the international symposium on anchoring and grouting techniques,1994年
  • 2朱维申,第五届全国岩土力学数值分析与解析方法讨论会论文集,1994年
  • 3朱维申,中国青年学者岩土力学及其应用讨论会论文集,1994年
  • 4卓家寿,1992年
  • 5团体著者,1991年
  • 6朱维申,复杂条件下围岩稳定性与岩体动态施工力学,1996年
  • 7姜彦忠,爆破技术基础,1994年,197页
  • 8孟吉复,爆破测试技术,1990年,94页
  • 9俞裕泰,岩石力学与工程学报,1987年,6卷,1期,147页
  • 10杨桂通,弹塑性力学,1980年,276页

共引文献187

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部