功果桥水电站土石过水围堰设计 被引量:5

Design of Overflow Earthrock Cofferdam,Gongguoqiao Hydropower Project
下载PDF
导出
摘要 修筑在大流量、深厚覆盖层河道上的土石过水围堰,过水期间的抗冲刷及整体稳定是设计的难点。文章对围堰设计思路、关键技术问题及其解决措施进行了全面阐述。功果桥水电站围堰无论是过水围堰高度、覆盖层深度、过水流量,还是贫胶凝粗粒料施工规模均处于中国先进水平。围堰经2 a的过流检验,未发生破坏,实现了预期目标。 Design of the overflow rockearth cofferdam built on the river with high discharge and the deep & thick overburden on the ri- verbed shall focus on the scouring protection and integrated stability of the cofferdam during the overflow operation. In the paper, the cofferdam design concept, key technical points and handling measures are fully described. In China, the overflow cofferdam height, overburden depth, overflow discharge and the construction scale of the low-cementitious coarse materials of Gongguoqiao Hydropower Project all are at advanced level. Experienced by 2 a overflow operation, the cofferdam is not failed and the expected objective is reached.
出处 《西北水电》 2014年第3期40-42,共3页 Northwest Hydropower
关键词 土石过水围堰 深厚覆盖层 碾压贫胶凝粗粒料 基坑充水 功果桥水电站 overflow earth-rock cofferdam deep and thick overburden compaction of low- cementitious coarse material water filling of foundation pit Gongguoqiao Hydropower Project
  • 相关文献

参考文献5

二级参考文献11

共引文献23

同被引文献22

引证文献5

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部