摘要
西藏尼洋河多布水电站库区318国道改建公路是基于多布水电站的建设而对原318国道进行改建的一条道路。文章就此段318国道改建工程总体设计过程中需考虑的几个问题进行探讨。
The reconstruction of the national highway No. 318 in the reservoir area of Duobu Hydropower Project on the Niyang River, Tibet is based on the existing section of the national highway No. 318 in the area where Duobu Hydropower Project is being built. In this paper, tips on the general layout design of the highway section to be rebuilt are described.
出处
《西北水电》
2014年第3期58-61,共4页
Northwest Hydropower
关键词
318国道
改建公路
多布水电站
自然景观
施工方案
the national highway No. 318
rebuilt highway
Duobu Hydropower Project
natural landscape
construction scheme