摘要
加纳布维水电站为坝后式厂房,厂房所处位置离挑流泄洪坝段较近,枢纽泄洪时将在厂区形成极强的雾化雨。文章引入模糊数学理论来预测布维水电站泄洪雾雨强度和分布范围,在布维水电站厂房屋顶排水及厂区排水设计时均参照了这一计算结果。
The powerhouse of Bui Hydropower Project is at the dam toe. It is close to the dam sections where flood discharge by flipping is arranged. While the flood is discharged, the atomized rainfall at an extremely high intensity is caused. In this paper, the fuzzing mathematics is applied to predict the intensity and distribution of the atomized rainfall while the flood is discharged. The computation results of the atomized rainfall are considered while the drainage for the powerhouse rood and plant area is designed.
出处
《西北水电》
2014年第3期75-78,共4页
Northwest Hydropower
关键词
挑流泄洪
雾化雨
模糊数学
布维水电站
flood discharge by flipping
atomized rain
fuzzing mathematics
Bui Hydropower Project