摘要
由软土路堤填筑产生的附加荷载所引起的超静水压力的消散必须经历一定时间才能完成,为保证路基的稳定性,减小路基工后沉降量,必须加强软土路堤的施工观测与控制。在综述有关成果资料的基础上,分析和探讨了软土路堤施工观测的范围、内容、断面布置、要求与施工控制要点等。
It must has been for a long time to dissipate the additional water pressure, which caused by filling road embankment on soft soil ground. We must enhance the observation and controlling in the process of filling road embankment on soft soil ground. In the base of summarizing the related result, we have been analyzed the observation of range, contents, arranging the cross section, request and the controlling point in the process of filling the road embankment.
出处
《安徽建筑》
2002年第2期39-41,共3页
Anhui Architecture
关键词
软土路基
路基施工
施工观测
临界高度
road embankment on soft soil ground the settlement after construction the observation in the process of filling the road embankment critical height