介绍广东奥林匹克体育场塔柱在施工过程中解决模板工程、垂直运输、垂直度、斜率与高程的控制、水化热控制。
In this article, authors introduce some construction problems and their solutions in the construction of high tower columns of Guangdong Olympic Stadium. These problems include formwork, vertical transportation, verticality, control of slope rate and altitude, control of hydration heat, and suspended beams and so on.
出处
《施工技术》
CAS
北大核心
2002年第4期6-7,共2页
Construction Technology