介绍了王曲电厂高压起动 /备用变压器引自山西电网 ,而发电机接入山东电网 ,两网不联的特殊情况 ,阐述了发电机装设出口断路器的必要性 。
The technical analyses and economic comparisons for the generator with GCB and also the necessity for the generator with GCB are discussed when the generator is connected to a network and the startup/standby transformer is supplied from another.
出处
《山西电力》
2002年第1期1-3,7,共4页
Shanxi Electric Power