摘要
针对河津电厂 2台 35 0 MW汽轮发电机组所配置的 4台汽动给水泵的异常运行工况进行了分析 ,提出并采取了相应的措施 。
It discusses about the four boiler feedwater pumps of HEJIN power plant two 350MW units manufactared by MITSUBISHI Company in JAPAN,analyse and diagnose the feedwater pump abnomal during turbine operation, some measures and adjustments are taken,the effectiveness is obvious,meantime the experience is good to the same pumps or equipments.
出处
《山西电力》
2002年第1期40-42,共3页
Shanxi Electric Power