混合堆芯的热工水力设计是一项关系到核安全和可靠生产的重要内容。本文以大亚湾核电站18个月换料为例,阐述了混合堆芯热工水力设计的设计基准,重点介绍了混合堆芯的DNB热工水力设计方法,并对大亚湾核电站18个月换料工程的混合堆芯进行分析,结果表明,其设计符合要求。
Mixed core compatibility is one of important issues affecting the nuclear safety and the reliable generation of a Nuclear Power Plant.In this paper,the thermal&hydraulic design and safety bases of mixed cores are defined and the approach of DNB design is well illustrated with its applica-tion to the18-month fuel cycles project of Daya Bay Nuclear Power Plant.The mixed core analyses of the project shows that the requirements are fully satisfied.
出处
《核动力工程》
EI
CAS
CSCD
北大核心
2002年第2期17-20,共4页
Nuclear Power Engineering