本文介绍渤海辽东湾SZ36-1 油田实验区AⅡ平台丛式钻井的情况。该平台造斜点浅,水平位移大,井斜角大,且地层疏松不胶结,裸眼段长,中靶精度要求高。用275天累计进尺32572m钻完了16口定向斜井,中靶率100%。
The Situation about cluster drilliog on A Ⅱ platform at the experimental area in SZ 36--1 oil field in Liaodong Bay is presented in this article. The well has a shallow deviating point, a large hori- zontal departure,a big deviation angle and a long open hole,the formation is loose and unconsolidated, and the precision reaching the target. is highly prescribed. Sixteen directional deviated wells were drilled in 275 days, obtaining 32572 m. of accumulated footage and 100% of the rate of reaching the target.
出处
《天然气工业》
EI
CAS
CSCD
北大核心
1991年第5期53-57,共5页
Natural Gas Industry
关键词
辽东湾
油田
丛式钻井
Liaodong Bay
SZ 36—1 oil field
cluster drilling