期刊文献+

京津四线及引入天津枢纽南仓疏解方案探讨

Probe into the Operation of Fourth Beijing-Tianjin Line and the Scattering Plan at Nancang Station when Introducing the Line into Tianjin Joint Terminal
下载PDF
导出
摘要 通过对既有京山线京津段及天津枢纽南仓疏解区运营现状的分析 ,找出影响线路通过能力的控制因素 ,论述了京津段增建Ⅳ线及改造南仓疏解区的迫切性 ,综合考虑区间三线的运营状况 ,区间车站站房、货场布置以及引入枢纽的接线条件等因素 。 Through an analysis to the current operation situation in Beijing Tianjin section of Beijing Shanhaiguan Line as well as the Nancang scattering zone of Tianjin joint terminal, this paper finds out the bottleneck of the line capacity and illustrates the stringency of adding a fourth Beijing Tianjin Line and of modifying the Nancang scattering zone. This paper discusses a detailed solution, taking into comprehensive consideration the operation situation of the three sectional lines, sectional stations and buildings, layout of freight yards and the receiving conditions of introducing into joint terminal, etc.
作者 刘建光
出处 《铁道运输与经济》 北大核心 2002年第5期20-22,共3页 Railway Transport and Economy
关键词 南仓站 疏解 天津 铁路枢纽 京山线 北京至天津段 the fourth Beijing Tianjin Line joint terminal scattering plan
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部