摘要
结合INFI-90系统在湛江发电厂Ⅱ期工程的应用现状,对其中的锅炉燃烧管理系统(BMS)存在的问题做较全面的剖析,介绍打火器、火焰检测、MFT(主燃料跳闸)回路等改进的实施经验及系统改进后的应用效果,为国内同类用户提供借鉴。
Combining with INFI-90's application in Zhanjiang Power Plant phase II,the problems existing in the burner management system(BMS )of boiler are analyzed completely.Experiences of improving ignition,flame detection and master fuel trip(MFT)loop are presented with emphasis on the result of improvement ,affording the other customers references.
出处
《中国电力》
CSCD
北大核心
2002年第3期59-61,共3页
Electric Power