摘要
合理的计算与正确的确定展延工期是业主和承包商十分关注且直接影响双方利益的大事。故此对展延工期的审批原则作了确切的说明。进而对工程中常遇到的展延工期的计算方法 ,进行了多方分析与探讨 ,分别讨论了各种干扰因素对工期的影响 ,分清干扰因素的责任方 ,并提出合理的计算方法。
The reasonable calculation and corrective determination for prolonged project are great event concerned by owner and contractor and influencing the both benefits directly, so the paper explain the examination and approval principle exactly. Multi analysis and discussion are processed for the calculation methods of prolonged projects. At last the influences of some interference elements on time limit are discussed and reasonable calculation methods are proposed.
出处
《山西建筑》
2002年第4期119-120,共2页
Shanxi Architecture