BOT项目融资模式风险分析 被引量:22

The risk analysis on the BOT financing model
下载PDF
导出
摘要 BOT是一种新型的项目融资模式。它的基本特点是开放基础设施领域以利用外资 ,适用于在基础设施投入不足的发展中国家为大型电力项目筹集建设资金。风险问题是BOT项目的核心问题。BOT项目的风险分为系统风险和非系统风险。前者包括政治风险、法律风险、金融风险、或有风险 ;后者包括完工风险、生产风险等。风险分配是BOT项目风险管理的基础。深圳沙角B电厂是我国首次使用BOT融资概念建设的基础设施项目 ,它采用了有效的风险管理机制 。 BOT is a new project financing way. Its basic feature is to open the infrastructure construction restrictions in order to use foreign capitals. Such financing is suitable to the developing countries where the capital input for infrastructure is short, such as financing for the construction of large sized power project. The core problem of such financing is risk problems. The risks in BOT projects can be divided into systematic and non systematic risks. The former includes political, lawful, financial and probable risks and the later includes project completion risk and production risk. The distribution of risks is the basis of risk management of BOT project. The Shajiao B Power Plant in Shenzhen is the first infrastructure project using BOT financing way in China. This project adopted effective risk management mechanism, which can be used as a reference for the implementation of BOT project in some developing countries.
作者 高析
出处 《水力发电》 北大核心 2002年第4期10-14,共5页 Water Power
关键词 BOT 融资 风险 深圳沙角B电厂 系统风险 BOT, financing, risk, Shajiao B Power Plant in Shenzhen
  • 相关文献

参考文献3

  • 1北京市工程咨询公司.BOT项目指南[M].北京:地震出版社,1995,11..
  • 2王辉 何伯森.BOT模式项目融资的风险研究.BOT理论与实务研讨会论文集[M].,1999..
  • 3何伯森,万彩芸.BOT项目的风险分担与合同管理[J].中国港湾建设,2001,21(5):63-66. 被引量:29

二级参考文献2

共引文献30

同被引文献78

引证文献22

二级引证文献61

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部