阐述了石泉水电厂1^#F油压装置的选型及改造过程,对新油压装置的系统结构、功能进行了简单介绍,针对现场安装调试中遇到的问题及解决办法进行了分析论述。
The No.1 generator oil pressure equipment alteration process and its main structure and functions are introduced briefly in the paper. At the same time, the trouble problems met in the installation process are analyzes and solving method are explained.
出处
《西北水力发电》
2002年第1期24-25,37,共3页
Journal of Northwest Hydroelectric Power
关键词
石泉水电厂
油压装置
技术改造
安装调试
Shiquan hydropower station
oil pressure equipment
technic alternation