摘要
简要介绍了武汉市轨道交通2号线的工程概况,对其线路局部方案、过江节点、车站换乘、站间距等问题进行探讨,并提出建议。
After briefly presenting the general introduction of Wuhan Rail Transit Line No. 2, this paper discusses several issues including alignment partial scheme, river-crossing node, station passenger transfer and station interval, etc., and makes some suggestions.
出处
《地下工程与隧道》
2002年第1期21-25,55,共5页
Underground Engineering and Tunnels