摘要
通过分析时间与直接费、间接费的关系 ,从双代号网络图关键线路中费用增加最小的工序开始逐步压缩 。
Based on the analysis on the relationship between time and direct, indirect costs, this article indicates that the optimal solution of job duration and construction cost can be completed by compacting the procedure that increase in cost is the minimum from the critical path in the double- remark network.