分析了目前双层床及双室床运行中存在的问题 ,提出了双中排双层床设计方案 ,并通过试验台和工业性试验 ,验证了《双中排阴双层床》在工业应用中的可行性及其与原双层床。
The operational problems existed in current duel layer bed ionexchanger and duel compartment bed are analysed and the design plan for duel lager ded with double draining system has been proposed and the pilot test and industrial test of the equipment has been passed.The result showed the feasibility of industrial application of the equipment and its advantage over the original duel layer and duel compart ment beds.
出处
《华东电力》
北大核心
2002年第3期8-11,共4页
East China Electric Power
关键词
双中排阴双层床
设计
水处理
水质
树脂
发电厂
duel layer bed
duel compartment bed
duel layer double medium drain bed