通过对设计部门推荐的矿山基建时期以及该矿目前实际采用取样方式的分析 ,采用类比和数学 2种方法的比较 ,推荐出了北氵名河铁矿由基建转入生产后地质取样方法和取样间距 。
Baseded on the analysis of the sampling method proposed by the designing department for the capital construction period and the one presently adopted by Beiminghe Iron Mine and the comparision of analogue method with mathematical one,the geological sampling method and sampling space are recommeded for the mine which is at a stage of transion from the capital construction to the production and the econimic benefits to be obtained from the new sampling mode estimated.