摘要
北氵名河铁矿副井、主井井塔先后采用滑模施工 ,通过严密组织 ,科学管理 ,达到安全、快速、优质的目的。
Slippermould method was applied in the construction of the towers of the main and auxiliary shafts at Beiminghe Iron Mine and by strict organization and scientific management,a safe,rapid and fine quality construction was realized,which helps accumulate some experiences for the future construction of the buildings of shaft tower type.
出处
《金属矿山》
CAS
北大核心
2002年第5期53-54,57,共3页
Metal Mine
关键词
滑模施工技术
井塔
变断面
滑具
Shaft tower,Slippermould,Varied section,Idle slipping